If available, indicate the share of rooftop solar PV (including residential, commercial, industrial, public buildings) (MW/%)
If available, indicate the share of residential plants (MW/%)
If available, indicate the share of plants for self-consumption/net metering (MW/%)
If available, indicate the share of plants for total grid input (MW/%)
If available, indicate the capacity of plants participating in energy communities/community power (MW)
If available, indicate the off-grid total installed capacity and divided by sector (residential, industrial/commercial/agriculture, public) (MW)
If known, indicate your country's potential capacity for rooftop solar (including all buildings: residential, commercial/industrial/agriculture, public, etc.). Please consider also indicative data or estimates resulting from statistical elaborations, as well as studies regarding specific geographical areas within the country (MW)
If known, indicate the share of residential to total potential rooftop capacity. Please consider also indicative data or estimates resulting from statistical elaborations, as well as studies regarding specific geographical areas within the country (MW/%)
If known, indicate the potential capacity of solar parking lots. Please consider also indicative data or estimates resulting from statistical elaborations, as well as studies regarding specific geographical areas within the country (MW)
List any relevant used national and international source, document or study
If available, indicate your country's target for rooftop solar PV (alternatively, any other targets put forth for solar PV)
Describe the type of meters employed (e.g. electromechanical meter or digital meter) and if possible indicate the digital meter substitution rate in residential and industrial/commercial/agricultural buildings
Describe positive aspects and main barriers (e.g. airport proximity, historical buildings, park area proximity, differentiation based on plants size or on type of consumption) of your country's overall authorization process (copy)
Describe the most complex or long stage of permitting in your country (e.g. authorization of rooftop plant, authorization for grid connection)
Indicate whether there are uniform authorization procedures at national level or they are differentiated at local level
Indicate any policy instruments currently foreseen or recommended to simplify the authorization process in your country
Indicate any policy instruments currently in place or foreseen that would result in a negative impact for rooftop solar PV installations
Describe incentive mechanisms in place for installation of rooftop PV, divided by plants size and product sectors (e.g. tax or bills breaks, incentives for energy storage systems, for energy communities)
Describe incentive mechanisms in place for power production of rooftop PV, divided by plants size and product sectors (e.g. self-consumption incentives, incentives for energy production, incentives for energy communities)
Indicate any incentive mechanisms that have stimulated deployment of installations
Indicate incentives that the government or the industry recommend to further stimulate deployment of installations